o Titan. After four years from the start of the study Yankee expected that personnel within the subsidiary would be able to handle any further developments. Preparing for the in country phase of the study is perhaps more important than the actual time spent in the country conducting research. Before departing for Athens with his team, Mr. Walbecker prepared an outline for each day's activities for the entire study period. He also had the individuals make a contact list, which contained a bank, an accounting firm, a lawyer, an equipment supplier, the embassy, the ministry, as well as industry source phone and cable numbers. Another important point that was covered was that Mr. Walbecker made maps available to the team of the location, and showed documentary films discussing the political and economical situation of the country as well. Shots and medical supplies were also made available and taken with the team. Language was also a concern to the accuracy of the study. Based on this fact personnel were required to attend classes on the language even if they had some prior knowledge. After sufficiently preparing the personnel for the trip, Mr. Walbecker departed with the team for Athens. For the first four days the team was allowed to orient themselves to their surroundings. There are several reasons why the team was given this time to relax. First, they had to recover from the long flight. Physical and mental stamina were at a low-point when the team left the plane. Secondly, the change in surroundings has an effect on the emotions of a person. Third, it allows for the creation of a team from a...