existing one. This should limit traffic problems because one bridge will support northern traffic to Fort Erie, whereas the other bridge will support southern traffic to Buffalo. However, people from the Buffalo area do not advocate this design. For example, The New Millennium Group of Buffalo (area professionals in their 20s and 30s) said, “The Peace Bridge is so ugly that nobody will even jump off it, to build another like it would be absurd.” In addition, David Chen of The New York Times states, “The current bridge looks like a scaly aquatic monster.” The people of Buffalo advocate a signature span design. This type of bridge would resemble the Golden Gate Bridge in San Francisco. The signature bridge is a single bridge that is supported by a foundation at the center, and suspension cables. This type of bridge holds north, and south traffic. People from Buffalo like this style because of its beauty, and landmark possibilities. However, no agreement can be made on what type of bridge to build.The twin span would cost 90 million dollars and take 4-5 years to build, whereas the signature span would cost around 70 million dollars and take 8-10 years to build. The root of the problem is that Buffalo wants the perfect bridge built, and Fort Erie just wants something to be built. Fort Erie’s point can be summed up with a quote by Mayor Redkop, “The bridge is only one mile long, just build and build now.” Both sides must come to an agreement or nothing will be built. The building of a new bridge is crucial. When a new one is built economic positives will be great for Buffalo.The PBA explains, “The Peace Bridge is the fastest growing international link in the world. It leads to intrastate, interstate, and international commerce.” The money value of the goods traveling over the bridge is up 70% since 1990. Also, the Peace Bridge accounts for 12% of all trade between the U...